US Bridges

NW Vivion RD over Pedestrian Pathway Li

Good

Platte County, Missouri · S 4 T 50 N R 33 W · Structure no. 37261

Built
2009
16 years old
Condition
Good
inspected April 2024
Type
Culvert
Concrete
Length
32 ft
1 main span
Daily traffic
5,780
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

NW Vivion RD over Pedestrian Pathway Li is a concrete culvert carrying NW Vivion RD over Pedestrian Pathway Li in Platte County, Missouri. It was built in 2009, so it is 16 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,780 vehicles a day, roughly 10% of them trucks, projected to reach 10,982 by 2044. The structure is 32 ft (9.8 m) long and 52 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesNW Vivion RD
CrossesPedestrian Pathway Li
LocationS 4 T 50 N R 33 W
RouteCity Street 0
Coordinates39.17628, -94.61492
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.5 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length32 ft (9.8 m)
Longest span32 ft (9.8 m)
Deck width52 ft (15.9 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,780 (2024)
Projected traffic10,982 by 2044
Trucks10%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was NW Vivion RD over Pedestrian Pathway Li built?

It was built in 2009, making it 16 years old in 2025.

What condition is NW Vivion RD over Pedestrian Pathway Li in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does NW Vivion RD over Pedestrian Pathway Li carry?

About 5,780 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is NW Vivion RD over Pedestrian Pathway Li?

The structure is 32 ft (9.8 m) long with a longest span of 32 ft (9.8 m) and a deck 52 ft wide.

Who owns NW Vivion RD over Pedestrian Pathway Li?

It is owned by the City or Municipal Highway Agency.