Cst NW Old Tiffany over I-29 Praire RD Is 29 I
GoodPlatte County, Missouri · S 1 T 51 N R 34 W · Structure no. 35735
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected April 2024
- Type
- Tee Beam
- Prestressed Concrete Continuous
- Length
- 338 ft
- 3 main spans
- Daily traffic
- 1,525
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Cst NW Old Tiffany over I-29 Praire RD Is 29 I is a prestressed concrete continuous tee beam carrying Cst NW Old Tiffany over I-29 Praire RD Is 29 I in Platte County, Missouri. It was built in 2017, so it is 8 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,525 vehicles a day, roughly 2% of them trucks, projected to reach 2,898 by 2044. The structure is 338 ft (103 m) long and 76 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Cst NW Old Tiffany over I-29 Praire RD Is 29 I built?
It was built in 2017, making it 8 years old in 2025.
What condition is Cst NW Old Tiffany over I-29 Praire RD Is 29 I in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does Cst NW Old Tiffany over I-29 Praire RD Is 29 I carry?
About 1,525 vehicles per day (2024 count), of which roughly 2% are trucks.
How long is Cst NW Old Tiffany over I-29 Praire RD Is 29 I?
The structure is 338 ft (103 m) long with a longest span of 130 ft (39.6 m) and a deck 76 ft wide.
Who owns Cst NW Old Tiffany over I-29 Praire RD Is 29 I?
It is owned by the City or Municipal Highway Agency.