US Bridges

Highland DR over Burgher CR

FairPosted for load

Phelps County, Missouri · S 12 T 37 N R 8 W · Structure no. 22852

Built
1970
55 years old
Condition
Fair
inspected November 2023
Type
Slab
Concrete Continuous
Length
27 ft
2 main spans
Daily traffic
1,000
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Highland DR over Burgher CR is a concrete continuous slab carrying Highland DR over Burgher CR in Phelps County, Missouri. It was built in 1970, so it is 55 years old, older than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 1,000 vehicles a day, roughly 10% of them trucks, projected to reach 1,450 by 2044. The structure is 27 ft (8.2 m) long and 44 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesHighland DR
CrossesBurgher CR
LocationS 12 T 37 N R 8 W
RouteCity Street 0
Coordinates37.94924, -91.75192
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating17.9 US tons
Inventory rating10.9 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadOther
Structure length27 ft (8.2 m)
Longest span12 ft (3.7 m)
Deck width44 ft (13.4 m)
Roadway width35 ft (10.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2024)
Projected traffic1,450 by 2044
Trucks10%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$275,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Highland DR over Burgher CR built?

It was built in 1970, making it 55 years old in 2025.

What condition is Highland DR over Burgher CR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does Highland DR over Burgher CR carry?

About 1,000 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Highland DR over Burgher CR?

The structure is 27 ft (8.2 m) long with a longest span of 12 ft (3.7 m) and a deck 44 ft wide.

Who owns Highland DR over Burgher CR?

It is owned by the City or Municipal Highway Agency.