County RD 3000 over Lit Dry Fk CR
FairPosted for loadPhelps County, Missouri · S 8 T 37 N R 7 W · Structure no. 13615
- Built
- 1937
- 88 years old
- Condition
- Fair
- inspected November 2023
- Type
- Tee Beam
- Concrete
- Length
- 163 ft
- 4 main spans
- Daily traffic
- 100
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
County RD 3000 over Lit Dry Fk CR is a concrete tee beam carrying County RD 3000 over Lit Dry Fk CR in Phelps County, Missouri. It was built in 1937, so it is 88 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 100 vehicles a day, roughly 10% of them trucks, projected to reach 130 by 2044. The structure is 163 ft (49.7 m) long and 23 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County RD 3000 over Lit Dry Fk CR built?
It was built in 1937, making it 88 years old in 2025.
What condition is County RD 3000 over Lit Dry Fk CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does County RD 3000 over Lit Dry Fk CR carry?
About 100 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is County RD 3000 over Lit Dry Fk CR?
The structure is 163 ft (49.7 m) long with a longest span of 40 ft (12.2 m) and a deck 23 ft wide.
Who owns County RD 3000 over Lit Dry Fk CR?
It is owned by the County Highway Agency.