US Bridges

Mo 100 E over Shawnee CR

Good

Osage County, Missouri · S 1 T 45 N R 7 W · Structure no. 36369

Built
2020
5 years old
Condition
Good
inspected February 2025
Type
Tee Beam
Prestressed Concrete Continuous
Length
118 ft
2 main spans
Daily traffic
427
2024 count
Owner
State
State Highway Agency

About this bridge

Mo 100 E over Shawnee CR is a prestressed concrete continuous tee beam carrying Mo 100 E over Shawnee CR in Osage County, Missouri. It was built in 2020, so it is 5 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 427 vehicles a day, roughly 11% of them trucks, projected to reach 619 by 2044. The structure is 118 ft (36.1 m) long and 29 ft wide. If it were closed, the detour would be 39.8 mi (64 km).

CarriesMo 100 E
CrossesShawnee CR
LocationS 1 T 45 N R 7 W
RouteState Highway 100
Coordinates38.68334, -91.65255
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating72.4 US tons
Inventory rating43.7 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length118 ft (36.1 m)
Longest span67 ft (20.4 m)
Deck width29 ft (8.7 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic427 (2024)
Projected traffic619 by 2044
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed39.8 mi (64 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Mo 100 E over Shawnee CR built?

It was built in 2020, making it 5 years old in 2025.

What condition is Mo 100 E over Shawnee CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.

How much traffic does Mo 100 E over Shawnee CR carry?

About 427 vehicles per day (2024 count), of which roughly 11% are trucks.

How long is Mo 100 E over Shawnee CR?

The structure is 118 ft (36.1 m) long with a longest span of 67 ft (20.4 m) and a deck 29 ft wide.

Who owns Mo 100 E over Shawnee CR?

It is owned by the State Highway Agency.