US Bridges

County RD 416 over Drain Dtch

FairPosted for load

Osage County, Missouri · S 12 T 44 N R 10 W · Structure no. 28821

Built
1975
50 years old
Condition
Fair
inspected April 2023
Type
Slab
Concrete
Length
21 ft
1 main span
Daily traffic
30
2023 count
Owner
County
County Highway Agency

About this bridge

County RD 416 over Drain Dtch is a concrete slab carrying County RD 416 over Drain Dtch in Osage County, Missouri. It was built in 1975, so it is 50 years old, older than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 30 vehicles a day, roughly 10% of them trucks, projected to reach 42 by 2043. The structure is 21 ft (6.4 m) long and 14 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCounty RD 416
CrossesDrain Dtch
LocationS 12 T 44 N R 10 W
RouteCounty Highway 250
Coordinates38.578, -91.9665
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation2: Basically intolerable, requiring high priority of replacement
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating9.9 US tons
Inventory rating6 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadOther
Structure length21 ft (6.4 m)
Longest span21 ft (6.4 m)
Deck width14 ft (4.2 m)
Roadway width14 ft (4.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30 (2023)
Projected traffic42 by 2043
Trucks10%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$239,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was County RD 416 over Drain Dtch built?

It was built in 1975, making it 50 years old in 2025.

What condition is County RD 416 over Drain Dtch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does County RD 416 over Drain Dtch carry?

About 30 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is County RD 416 over Drain Dtch?

The structure is 21 ft (6.4 m) long with a longest span of 21 ft (6.4 m) and a deck 14 ft wide.

Who owns County RD 416 over Drain Dtch?

It is owned by the County Highway Agency.