US Bridges

125th ST over Mass Br

Good

Nodaway County, Missouri · S 10 T 66 N R 37 W · Structure no. 36792

Built
2019
6 years old
Condition
Good
inspected December 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
100 ft
1 main span
Daily traffic
10
2024 count
Owner
County
County Highway Agency

About this bridge

125th ST over Mass Br is a steel stringer/multi-beam or girder carrying 125th ST over Mass Br in Nodaway County, Missouri. It was built in 2019, so it is 6 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10 vehicles a day, roughly 10% of them trucks, projected to reach 12 by 2044. The structure is 100 ft (30.5 m) long and 25 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

Carries125th ST
CrossesMass Br
LocationS 10 T 66 N R 37 W
RouteCounty Highway 32
Coordinates40.54015, -95.08789
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66.5 US tons
Inventory rating39.7 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length100 ft (30.5 m)
Longest span99 ft (30.3 m)
Deck width25 ft (7.5 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10 (2024)
Projected traffic12 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 125th ST over Mass Br built?

It was built in 2019, making it 6 years old in 2025.

What condition is 125th ST over Mass Br in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does 125th ST over Mass Br carry?

About 10 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is 125th ST over Mass Br?

The structure is 100 ft (30.5 m) long with a longest span of 99 ft (30.3 m) and a deck 25 ft wide.

Who owns 125th ST over Mass Br?

It is owned by the County Highway Agency.