US Bridges

Liberty RD over Mozingo Br

FairPosted for load

Nodaway County, Missouri · S 6 T 65 N R 34 W · Structure no. 34486

Built
2008
17 years old
Condition
Fair
inspected January 2025
Type
Stringer/Multi-beam or Girder
Steel
Length
49 ft
1 main span
Daily traffic
15
2024 count
Owner
County
County Highway Agency

About this bridge

Liberty RD over Mozingo Br is a steel stringer/multi-beam or girder carrying Liberty RD over Mozingo Br in Nodaway County, Missouri. It was built in 2008, so it is 17 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 15 vehicles a day, roughly 10% of them trucks, projected to reach 17 by 2044. The structure is 49 ft (14.9 m) long and 25 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesLiberty RD
CrossesMozingo Br
LocationS 6 T 65 N R 34 W
RouteCounty Highway 0
Coordinates40.463, -94.75922
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation2: Basically intolerable, requiring high priority of replacement
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating5 US tons
Inventory rating3 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length49 ft (14.9 m)
Longest span48 ft (14.6 m)
Deck width25 ft (7.5 m)
Roadway width24 ft (7.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15 (2024)
Projected traffic17 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$399,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Liberty RD over Mozingo Br built?

It was built in 2008, making it 17 years old in 2025.

What condition is Liberty RD over Mozingo Br in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.

How much traffic does Liberty RD over Mozingo Br carry?

About 15 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Liberty RD over Mozingo Br?

The structure is 49 ft (14.9 m) long with a longest span of 48 ft (14.6 m) and a deck 25 ft wide.

Who owns Liberty RD over Mozingo Br?

It is owned by the County Highway Agency.