US Bridges

CR 632 over Ditch

Good

New Madrid County, Missouri · S 31 T 24 N R 13 E · Structure no. 36906

Built
2021
4 years old
Condition
Good
inspected December 2024
Type
Channel Beam
Concrete
Length
38 ft
1 main span
Daily traffic
10
2023 count
Owner
County
County Highway Agency

About this bridge

CR 632 over Ditch is a concrete channel beam carrying CR 632 over Ditch in New Madrid County, Missouri. It was built in 2021, so it is 4 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10 vehicles a day, roughly 10% of them trucks, projected to reach 14 by 2043. The structure is 38 ft (11.6 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCR 632
CrossesDitch
LocationS 31 T 24 N R 13 E
RouteCounty Highway 37
Coordinates36.6865, -89.68543
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure9 ExcellentNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating108.1 US tons
Inventory rating64.5 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length38 ft (11.6 m)
Longest span33 ft (10.1 m)
Deck width24 ft (7.4 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10 (2023)
Projected traffic14 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 632 over Ditch built?

It was built in 2021, making it 4 years old in 2025.

What condition is CR 632 over Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does CR 632 over Ditch carry?

About 10 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is CR 632 over Ditch?

The structure is 38 ft (11.6 m) long with a longest span of 33 ft (10.1 m) and a deck 24 ft wide.

Who owns CR 632 over Ditch?

It is owned by the County Highway Agency.