US Bridges

Rt N S over Is 70

Good

Montgomery County, Missouri · S 30 T 48 N R 6 W · Structure no. 36488

Built
2020
5 years old
Condition
Good
inspected December 2021
Type
Tee Beam
Prestressed Concrete Continuous
Length
234 ft
4 main spans
Daily traffic
184
2024 count
Owner
State
State Highway Agency

About this bridge

Rt N S over Is 70 is a prestressed concrete continuous tee beam carrying Rt N S over Is 70 in Montgomery County, Missouri. It was built in 2020, so it is 5 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 184 vehicles a day, roughly 9% of them trucks, projected to reach 267 by 2044. The structure is 234 ft (71.2 m) long and 31 ft wide. If it were closed, the detour would be 42.3 mi (68 km).

CarriesRt N S
CrossesIs 70
LocationS 30 T 48 N R 6 W
RouteState Highway 0N
Coordinates38.89744, -91.63176
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionDecember 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating104.2 US tons
Inventory rating62.5 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length234 ft (71.2 m)
Longest span65 ft (19.8 m)
Deck width31 ft (9.3 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic184 (2024)
Projected traffic267 by 2044
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed42.3 mi (68 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Rt N S over Is 70 built?

It was built in 2020, making it 5 years old in 2025.

What condition is Rt N S over Is 70 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2021.

How much traffic does Rt N S over Is 70 carry?

About 184 vehicles per day (2024 count), of which roughly 9% are trucks.

How long is Rt N S over Is 70?

The structure is 234 ft (71.2 m) long with a longest span of 65 ft (19.8 m) and a deck 31 ft wide.

Who owns Rt N S over Is 70?

It is owned by the State Highway Agency.