Sunbeam RD over Elkhorn CR
FairPosted for loadMontgomery County, Missouri · S 11 T 48 N R 5 W · Structure no. 19468
- Built
- 1960
- 65 years old
- Condition
- Fair
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 25 ft
- 1 main span
- Daily traffic
- 100
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Sunbeam RD over Elkhorn CR is a steel stringer/multi-beam or girder carrying Sunbeam RD over Elkhorn CR in Montgomery County, Missouri. It was built in 1960, so it is 65 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 100 vehicles a day, roughly 10% of them trucks, projected to reach 125 by 2043. The structure is 25 ft (7.6 m) long and 24 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sunbeam RD over Elkhorn CR built?
It was built in 1960, making it 65 years old in 2025.
What condition is Sunbeam RD over Elkhorn CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does Sunbeam RD over Elkhorn CR carry?
About 100 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is Sunbeam RD over Elkhorn CR?
The structure is 25 ft (7.6 m) long with a longest span of 23 ft (7 m) and a deck 24 ft wide.
Who owns Sunbeam RD over Elkhorn CR?
It is owned by the County Highway Agency.