Chapel RD over Trib. to Moniteau
FairPosted for loadMoniteau County, Missouri · S 23 T 46 N R 14 W · Structure no. 13330
- Built
- 1930
- 95 years old, rebuilt 1999
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 30 ft
- 1 main span
- Daily traffic
- 25
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Chapel RD over Trib. to Moniteau is a steel stringer/multi-beam or girder carrying Chapel RD over Trib. to Moniteau in Moniteau County, Missouri. It was built in 1930 and reconstructed in 1999, so it is 95 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 25 vehicles a day, roughly 10% of them trucks, projected to reach 35 by 2044. The structure is 30 ft (9.1 m) long and 14 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Chapel RD over Trib. to Moniteau built?
It was built in 1930, making it 95 years old in 2025. It was reconstructed in 1999.
What condition is Chapel RD over Trib. to Moniteau in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Chapel RD over Trib. to Moniteau carry?
About 25 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Chapel RD over Trib. to Moniteau?
The structure is 30 ft (9.1 m) long with a longest span of 27 ft (8.2 m) and a deck 14 ft wide.
Who owns Chapel RD over Trib. to Moniteau?
It is owned by the County Highway Agency.