Mo 80 E over Spillway Dtch
FairMississippi County, Missouri · S 28 T 25 N R 16 E · Structure no. 1185
- Built
- 1965
- 60 years old, rebuilt 1992
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 98 ft
- 3 main spans
- Daily traffic
- 665
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Mo 80 E over Spillway Dtch is a steel stringer/multi-beam or girder carrying Mo 80 E over Spillway Dtch in Mississippi County, Missouri. It was built in 1965 and reconstructed in 1992, so it is 60 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 665 vehicles a day, roughly 2% of them trucks, projected to reach 931 by 2044. The structure is 98 ft (29.9 m) long and 31 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mo 80 E over Spillway Dtch built?
It was built in 1965, making it 60 years old in 2025. It was reconstructed in 1992.
What condition is Mo 80 E over Spillway Dtch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Mo 80 E over Spillway Dtch carry?
About 665 vehicles per day (2024 count), of which roughly 2% are trucks.
How long is Mo 80 E over Spillway Dtch?
The structure is 98 ft (29.9 m) long with a longest span of 33 ft (10.1 m) and a deck 31 ft wide.
Who owns Mo 80 E over Spillway Dtch?
It is owned by the State Highway Agency.