US Bridges

Rt C E over ST Francois Rvr

Good

Madison County, Missouri · S 3266 T 31 N R 5 E · Structure no. 36567

Built
2021
4 years old
Condition
Good
inspected October 2024
Type
Tee Beam
Prestressed Concrete Continuous
Length
284 ft
3 main spans
Daily traffic
161
2024 count
Owner
State
State Highway Agency

About this bridge

Rt C E over ST Francois Rvr is a prestressed concrete continuous tee beam carrying Rt C E over ST Francois Rvr in Madison County, Missouri. It was built in 2021, so it is 4 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 161 vehicles a day, roughly 7% of them trucks, projected to reach 225 by 2044. The structure is 284 ft (86.7 m) long and 27 ft wide. If it were closed, the detour would be 37.9 mi (61 km).

CarriesRt C E
CrossesST Francois Rvr
LocationS 3266 T 31 N R 5 E
RouteState Highway 0C
Coordinates37.38486, -90.47408
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.5 US tons
Inventory rating35.7 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length284 ft (86.7 m)
Longest span106 ft (32.3 m)
Deck width27 ft (8.1 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic161 (2024)
Projected traffic225 by 2044
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed37.9 mi (61 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Rt C E over ST Francois Rvr built?

It was built in 2021, making it 4 years old in 2025.

What condition is Rt C E over ST Francois Rvr in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Rt C E over ST Francois Rvr carry?

About 161 vehicles per day (2024 count), of which roughly 7% are trucks.

How long is Rt C E over ST Francois Rvr?

The structure is 284 ft (86.7 m) long with a longest span of 106 ft (32.3 m) and a deck 27 ft wide.

Who owns Rt C E over ST Francois Rvr?

It is owned by the State Highway Agency.