US Bridges

Rt D S over Turkey CR

Good

Lincoln County, Missouri · S 22 T 49 N R 2 W · Structure no. 33866

Built
2012
13 years old
Condition
Good
inspected September 2024
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete
Length
126 ft
3 main spans
Daily traffic
1,142
2024 count
Owner
State
State Highway Agency

About this bridge

Rt D S over Turkey CR is a prestressed concrete box beam or girders - single or spread carrying Rt D S over Turkey CR in Lincoln County, Missouri. It was built in 2012, so it is 13 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,142 vehicles a day, roughly 14% of them trucks, projected to reach 2,284 by 2044. The structure is 126 ft (38.3 m) long and 26 ft wide. If it were closed, the detour would be 34.2 mi (55 km).

CarriesRt D S
CrossesTurkey CR
LocationS 22 T 49 N R 2 W
RouteState Highway 0D
Coordinates39.00377, -91.12677
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating81.4 US tons
Inventory rating48.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length126 ft (38.3 m)
Longest span45 ft (13.7 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,142 (2024)
Projected traffic2,284 by 2044
Trucks14%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed34.2 mi (55 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Rt D S over Turkey CR built?

It was built in 2012, making it 13 years old in 2025.

What condition is Rt D S over Turkey CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Rt D S over Turkey CR carry?

About 1,142 vehicles per day (2024 count), of which roughly 14% are trucks.

How long is Rt D S over Turkey CR?

The structure is 126 ft (38.3 m) long with a longest span of 45 ft (13.7 m) and a deck 26 ft wide.

Who owns Rt D S over Turkey CR?

It is owned by the State Highway Agency.