US Bridges

Norton RD 585 over Big Lead CR

Good

Lincoln County, Missouri · S 16 T 50 N R 2 W · Structure no. 29263

Built
2001
24 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
75 ft
1 main span
Daily traffic
50
2023 count
Owner
County
County Highway Agency

About this bridge

Norton RD 585 over Big Lead CR is a steel stringer/multi-beam or girder carrying Norton RD 585 over Big Lead CR in Lincoln County, Missouri. It was built in 2001, so it is 24 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, roughly 10% of them trucks, projected to reach 80 by 2043. The structure is 75 ft (22.9 m) long and 24 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesNorton RD 585
CrossesBig Lead CR
LocationS 16 T 50 N R 2 W
RouteCounty Highway 107
Coordinates39.10086, -91.14389
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating72.4 US tons
Inventory rating43.7 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length75 ft (22.9 m)
Longest span73 ft (22.3 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2023)
Projected traffic80 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Norton RD 585 over Big Lead CR built?

It was built in 2001, making it 24 years old in 2025.

What condition is Norton RD 585 over Big Lead CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Norton RD 585 over Big Lead CR carry?

About 50 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is Norton RD 585 over Big Lead CR?

The structure is 75 ft (22.9 m) long with a longest span of 73 ft (22.3 m) and a deck 24 ft wide.

Who owns Norton RD 585 over Big Lead CR?

It is owned by the County Highway Agency.