US Bridges

County RD 1175 over Williams CR

Good

Lawrence County, Missouri · S 35 T 28 N R 26 W · Structure no. 32698

Built
2008
17 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
30 ft
1 main span
Daily traffic
40
2023 count
Owner
County
County Highway Agency

About this bridge

County RD 1175 over Williams CR is a steel stringer/multi-beam or girder carrying County RD 1175 over Williams CR in Lawrence County, Missouri. It was built in 2008, so it is 17 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 40 vehicles a day, roughly 10% of them trucks, projected to reach 56 by 2043. The structure is 30 ft (9.1 m) long and 23 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCounty RD 1175
CrossesWilliams CR
LocationS 35 T 28 N R 26 W
RouteCounty Highway 460
Coordinates37.09207, -93.74259
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating34.7 US tons
Inventory rating20.8 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length30 ft (9.1 m)
Longest span26 ft (7.9 m)
Deck width23 ft (7 m)
Roadway width22 ft (6.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic40 (2023)
Projected traffic56 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byOther Local Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was County RD 1175 over Williams CR built?

It was built in 2008, making it 17 years old in 2025.

What condition is County RD 1175 over Williams CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does County RD 1175 over Williams CR carry?

About 40 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is County RD 1175 over Williams CR?

The structure is 30 ft (9.1 m) long with a longest span of 26 ft (7.9 m) and a deck 23 ft wide.

Who owns County RD 1175 over Williams CR?

It is owned by the County Highway Agency and maintained by the Other Local Agency.