US Bridges

Halls Station RD over Lick Fk Tabo CR

Fair

Lafayette County, Missouri · S 6 T 50 N R 26 W · Structure no. 35156

Built
2012
13 years old
Condition
Fair
inspected November 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
33 ft
1 main span
Daily traffic
25
2024 count
Owner
County
County Highway Agency

About this bridge

Halls Station RD over Lick Fk Tabo CR is a prestressed concrete box beam or girders - multiple carrying Halls Station RD over Lick Fk Tabo CR in Lafayette County, Missouri. It was built in 2012, so it is 13 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 25 vehicles a day, roughly 10% of them trucks, projected to reach 33 by 2044. The structure is 33 ft (10.1 m) long and 20 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesHalls Station RD
CrossesLick Fk Tabo CR
LocationS 6 T 50 N R 26 W
RouteCounty Highway 109
Coordinates39.16548, -93.80841
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating93.3 US tons
Inventory rating55.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length33 ft (10.1 m)
Longest span31 ft (9.3 m)
Deck width20 ft (6.1 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25 (2024)
Projected traffic33 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Halls Station RD over Lick Fk Tabo CR built?

It was built in 2012, making it 13 years old in 2025.

What condition is Halls Station RD over Lick Fk Tabo CR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does Halls Station RD over Lick Fk Tabo CR carry?

About 25 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Halls Station RD over Lick Fk Tabo CR?

The structure is 33 ft (10.1 m) long with a longest span of 31 ft (9.3 m) and a deck 20 ft wide.

Who owns Halls Station RD over Lick Fk Tabo CR?

It is owned by the County Highway Agency.