Schoolville RD over Trib S Fk Blackwat
FairLafayette County, Missouri · S 36 T 50 N R 25 W · Structure no. 34068
- Built
- 2011
- 14 years old
- Condition
- Fair
- inspected November 2023
- Type
- Box Beam or Girders - Multiple
- Concrete
- Length
- 30 ft
- 1 main span
- Daily traffic
- 30
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Schoolville RD over Trib S Fk Blackwat is a concrete box beam or girders - multiple carrying Schoolville RD over Trib S Fk Blackwat in Lafayette County, Missouri. It was built in 2011, so it is 14 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 30 vehicles a day, roughly 10% of them trucks, projected to reach 39 by 2044. The structure is 30 ft (9.1 m) long and 21 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Schoolville RD over Trib S Fk Blackwat built?
It was built in 2011, making it 14 years old in 2025.
What condition is Schoolville RD over Trib S Fk Blackwat in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Schoolville RD over Trib S Fk Blackwat carry?
About 30 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Schoolville RD over Trib S Fk Blackwat?
The structure is 30 ft (9.1 m) long with a longest span of 27 ft (8.2 m) and a deck 21 ft wide.
Who owns Schoolville RD over Trib S Fk Blackwat?
It is owned by the County Highway Agency.