US Bridges

Rt F S over Post Oak CR

Fair

Johnson County, Missouri · S 24 T 45 N R 27 W · Structure no. 7906

Built
1955
70 years old, rebuilt 2016
Condition
Fair
inspected December 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
143 ft
3 main spans
Daily traffic
716
2024 count
Owner
State
State Highway Agency

About this bridge

Rt F S over Post Oak CR is a steel stringer/multi-beam or girder carrying Rt F S over Post Oak CR in Johnson County, Missouri. It was built in 1955 and reconstructed in 2016, so it is 70 years old, older than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 716 vehicles a day, roughly 8% of them trucks, projected to reach 1,110 by 2044. The structure is 143 ft (43.6 m) long and 22 ft wide. If it were closed, the detour would be 24.9 mi (40 km).

CarriesRt F S
CrossesPost Oak CR
LocationS 24 T 45 N R 27 W
RouteState Highway 0F
Coordinates38.68206, -93.84354
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating44.6 US tons
Inventory rating26.8 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadH 10
Structure length143 ft (43.6 m)
Longest span51 ft (15.6 m)
Deck width22 ft (6.8 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic716 (2024)
Projected traffic1,110 by 2044
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed24.9 mi (40 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Rt F S over Post Oak CR built?

It was built in 1955, making it 70 years old in 2025. It was reconstructed in 2016.

What condition is Rt F S over Post Oak CR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.

How much traffic does Rt F S over Post Oak CR carry?

About 716 vehicles per day (2024 count), of which roughly 8% are trucks.

How long is Rt F S over Post Oak CR?

The structure is 143 ft (43.6 m) long with a longest span of 51 ft (15.6 m) and a deck 22 ft wide.

Who owns Rt F S over Post Oak CR?

It is owned by the State Highway Agency.