CO RD SE 1300 over Br E Fork Tebo CR
PoorJohnson County, Missouri · S 26 T 44 N R 24 W · Structure no. 24345
- Built
- 1900
- 125 years old, rebuilt 1982
- Condition
- Poor
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 30 ft
- 2 main spans
- Daily traffic
- 45
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
CO RD SE 1300 over Br E Fork Tebo CR is a steel stringer/multi-beam or girder carrying CO RD SE 1300 over Br E Fork Tebo CR in Johnson County, Missouri. It was built in 1900 and reconstructed in 1982, so it is 125 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 3 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 45 vehicles a day, roughly 10% of them trucks, projected to reach 72 by 2043. The structure is 30 ft (9.1 m) long and 19 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 3 Serious | Loss of section, deterioration, spalling or scour have seriously affected primary structural components. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CO RD SE 1300 over Br E Fork Tebo CR built?
It was built in 1900, making it 125 years old in 2025. It was reconstructed in 1982.
What condition is CO RD SE 1300 over Br E Fork Tebo CR in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in December 2024.
How much traffic does CO RD SE 1300 over Br E Fork Tebo CR carry?
About 45 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is CO RD SE 1300 over Br E Fork Tebo CR?
The structure is 30 ft (9.1 m) long with a longest span of 15 ft (4.6 m) and a deck 19 ft wide.
Who owns CO RD SE 1300 over Br E Fork Tebo CR?
It is owned by the County Highway Agency.