CO RD SE 710 over Clear Fk
GoodJohnson County, Missouri · S 35 T 45 N R 25 W · Structure no. 23680
- Built
- 1900
- 125 years old, rebuilt 1988
- Condition
- Good
- inspected December 2024
- Type
- Tee Beam
- Prestressed Concrete Continuous
- Length
- 153 ft
- 3 main spans
- Daily traffic
- 110
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
CO RD SE 710 over Clear Fk is a prestressed concrete continuous tee beam carrying CO RD SE 710 over Clear Fk in Johnson County, Missouri. It was built in 1900 and reconstructed in 1988, so it is 125 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 110 vehicles a day, roughly 10% of them trucks, projected to reach 176 by 2043. The structure is 153 ft (46.6 m) long and 23 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CO RD SE 710 over Clear Fk built?
It was built in 1900, making it 125 years old in 2025. It was reconstructed in 1988.
What condition is CO RD SE 710 over Clear Fk in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does CO RD SE 710 over Clear Fk carry?
About 110 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is CO RD SE 710 over Clear Fk?
The structure is 153 ft (46.6 m) long with a longest span of 52 ft (15.8 m) and a deck 23 ft wide.
Who owns CO RD SE 710 over Clear Fk?
It is owned by the County Highway Agency.