US Bridges

CO RD SW 75 over Pin Oak CR

Fair

Johnson County, Missouri · S 26 T 46 N R 28 W · Structure no. 20595

Built
1982
43 years old
Condition
Fair
inspected November 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
51 ft
1 main span
Daily traffic
45
2023 count
Owner
County
County Highway Agency

About this bridge

CO RD SW 75 over Pin Oak CR is a steel stringer/multi-beam or girder carrying CO RD SW 75 over Pin Oak CR in Johnson County, Missouri. It was built in 1982, so it is 43 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 45 vehicles a day, roughly 10% of them trucks, projected to reach 72 by 2043. The structure is 51 ft (15.5 m) long and 21 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesCO RD SW 75
CrossesPin Oak CR
LocationS 26 T 46 N R 28 W
RouteCounty Highway 266
Coordinates38.75779, -93.97692
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating61.5 US tons
Inventory rating38.7 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadOther
Structure length51 ft (15.5 m)
Longest span49 ft (14.9 m)
Deck width21 ft (6.5 m)
Roadway width21 ft (6.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic45 (2023)
Projected traffic72 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CO RD SW 75 over Pin Oak CR built?

It was built in 1982, making it 43 years old in 2025.

What condition is CO RD SW 75 over Pin Oak CR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does CO RD SW 75 over Pin Oak CR carry?

About 45 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is CO RD SW 75 over Pin Oak CR?

The structure is 51 ft (15.5 m) long with a longest span of 49 ft (14.9 m) and a deck 21 ft wide.

Who owns CO RD SW 75 over Pin Oak CR?

It is owned by the County Highway Agency.