Sunrise School RD over Fletch Br
GoodJefferson County, Missouri · S 6 T 38 N R 5 E · Structure no. 21970
- Built
- 1998
- 27 years old
- Condition
- Good
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 56 ft
- 1 main span
- Daily traffic
- 1,026
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Sunrise School RD over Fletch Br is a prestressed concrete stringer/multi-beam or girder carrying Sunrise School RD over Fletch Br in Jefferson County, Missouri. It was built in 1998, so it is 27 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,026 vehicles a day, roughly 5% of them trucks, projected to reach 2,052 by 2043. The structure is 56 ft (17.1 m) long and 35 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sunrise School RD over Fletch Br built?
It was built in 1998, making it 27 years old in 2025.
What condition is Sunrise School RD over Fletch Br in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does Sunrise School RD over Fletch Br carry?
About 1,026 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is Sunrise School RD over Fletch Br?
The structure is 56 ft (17.1 m) long with a longest span of 56 ft (17.1 m) and a deck 35 ft wide.
Who owns Sunrise School RD over Fletch Br?
It is owned by the County Highway Agency.