Second ST over Tanyard Br
FairJefferson County, Missouri · S 3 T 39 N R 4 E · Structure no. 16223
- Built
- 1900
- 125 years old, rebuilt 2008
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 31 ft
- 1 main span
- Daily traffic
- 150
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Second ST over Tanyard Br is a steel stringer/multi-beam or girder carrying Second ST over Tanyard Br in Jefferson County, Missouri. It was built in 1900 and reconstructed in 2008, so it is 125 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 150 vehicles a day, roughly 2% of them trucks, projected to reach 255 by 2043. The structure is 31 ft (9.5 m) long and 34 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Second ST over Tanyard Br built?
It was built in 1900, making it 125 years old in 2025. It was reconstructed in 2008.
What condition is Second ST over Tanyard Br in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Second ST over Tanyard Br carry?
About 150 vehicles per day (2023 count), of which roughly 2% are trucks.
How long is Second ST over Tanyard Br?
The structure is 31 ft (9.5 m) long with a longest span of 29 ft (8.9 m) and a deck 34 ft wide.
Who owns Second ST over Tanyard Br?
It is owned by the City or Municipal Highway Agency.