Rp MO249N to MO171 over Mo 249 Mo 171 Mo & Ar
FairJasper County, Missouri · S 20 T 28 N R 32 W · Structure no. 31423
- Built
- 2006
- 19 years old, rebuilt 2022
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 1,474 ft
- 8 main spans
- Daily traffic
- 4,250
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Rp MO249N to MO171 over Mo 249 Mo 171 Mo & Ar is a steel continuous stringer/multi-beam or girder carrying Rp MO249N to MO171 over Mo 249 Mo 171 Mo & Ar in Jasper County, Missouri. It was built in 2006 and reconstructed in 2022, so it is 19 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,250 vehicles a day, roughly 17% of them trucks, projected to reach 7,650 by 2044. The structure is 1,474 ft (449.3 m) long and 28 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Rp MO249N to MO171 over Mo 249 Mo 171 Mo & Ar built?
It was built in 2006, making it 19 years old in 2025. It was reconstructed in 2022.
What condition is Rp MO249N to MO171 over Mo 249 Mo 171 Mo & Ar in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Rp MO249N to MO171 over Mo 249 Mo 171 Mo & Ar carry?
About 4,250 vehicles per day (2024 count), of which roughly 17% are trucks.
How long is Rp MO249N to MO171 over Mo 249 Mo 171 Mo & Ar?
The structure is 1,474 ft (449.3 m) long with a longest span of 245 ft (74.6 m) and a deck 28 ft wide.
Who owns Rp MO249N to MO171 over Mo 249 Mo 171 Mo & Ar?
It is owned by the State Highway Agency.