Jasper County, Missouri · S 12 T 27 N R 30 W · Structure no. 24773

Built
1998
27 years old
Condition
Good
inspected December 2024
Type
Culvert
Concrete
Length
28 ft
1 main span
Daily traffic
300
2024 count
Owner
County
County Highway Agency

About this bridge

CO RD60 & Apple RD over Trib of Motley CR is a concrete culvert carrying CO RD60 & Apple RD over Trib of Motley CR in Jasper County, Missouri. It was built in 1998, so it is 27 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 300 vehicles a day, roughly 10% of them trucks, projected to reach 450 by 2044. The structure is 28 ft (8.5 m) long and 81 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCO RD60 & Apple RD
CrossesTrib of Motley CR
LocationS 12 T 27 N R 30 W
RouteCounty Highway 550
Coordinates37.06534, -94.16774
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating70.4 US tons
Inventory rating42.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadOther
Structure length28 ft (8.5 m)
Longest span26 ft (7.9 m)
Deck width81 ft (24.8 m)
Roadway width80 ft (24.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic300 (2024)
Projected traffic450 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CO RD60 & Apple RD over Trib of Motley CR built?

It was built in 1998, making it 27 years old in 2025.

What condition is CO RD60 & Apple RD over Trib of Motley CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does CO RD60 & Apple RD over Trib of Motley CR carry?

About 300 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is CO RD60 & Apple RD over Trib of Motley CR?

The structure is 28 ft (8.5 m) long with a longest span of 26 ft (7.9 m) and a deck 81 ft wide.

Who owns CO RD60 & Apple RD over Trib of Motley CR?

It is owned by the County Highway Agency.