Central Ave over City Drain
FairJasper County, Missouri · S 3 T 28 N R 31 W · Structure no. 14663
- Built
- 1940
- 85 years old
- Condition
- Fair
- inspected February 2025
- Type
- Slab
- Concrete Continuous
- Length
- 32 ft
- 3 main spans
- Daily traffic
- 3,200
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Central Ave over City Drain is a concrete continuous slab carrying Central Ave over City Drain in Jasper County, Missouri. It was built in 1940, so it is 85 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,200 vehicles a day, roughly 10% of them trucks, projected to reach 4,800 by 2043. The structure is 32 ft (9.8 m) long and 18 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Central Ave over City Drain built?
It was built in 1940, making it 85 years old in 2025.
What condition is Central Ave over City Drain in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.
How much traffic does Central Ave over City Drain carry?
About 3,200 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is Central Ave over City Drain?
The structure is 32 ft (9.8 m) long with a longest span of 11 ft (3.4 m) and a deck 18 ft wide.
Who owns Central Ave over City Drain?
It is owned by the City or Municipal Highway Agency.