US Bridges

Olive ST over Drain Dtch

Fair

Jasper County, Missouri · S 5 T 28 N R 31 W · Structure no. 14639

Built
1960
65 years old
Condition
Fair
inspected February 2025
Type
Slab
Concrete
Length
35 ft
2 main spans
Daily traffic
300
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Olive ST over Drain Dtch is a concrete slab carrying Olive ST over Drain Dtch in Jasper County, Missouri. It was built in 1960, so it is 65 years old, older than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 300 vehicles a day, roughly 10% of them trucks, projected to reach 450 by 2043. The structure is 35 ft (10.7 m) long and 62 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesOlive ST
CrossesDrain Dtch
LocationS 5 T 28 N R 31 W
RouteCity Street 0
Coordinates37.1777, -94.3294
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.6 US tons
Inventory rating17.9 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadH 15
Structure length35 ft (10.7 m)
Longest span16 ft (4.9 m)
Deck width62 ft (18.8 m)
Roadway width46 ft (14 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic300 (2023)
Projected traffic450 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Olive ST over Drain Dtch built?

It was built in 1960, making it 65 years old in 2025.

What condition is Olive ST over Drain Dtch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.

How much traffic does Olive ST over Drain Dtch carry?

About 300 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is Olive ST over Drain Dtch?

The structure is 35 ft (10.7 m) long with a longest span of 16 ft (4.9 m) and a deck 62 ft wide.

Who owns Olive ST over Drain Dtch?

It is owned by the City or Municipal Highway Agency.