US Bridges

Rp IS670E to Centr over Fill

Fair

Jackson County, Missouri · S 5 T 49 N R 33 W · Structure no. 913

Built
1966
59 years old
Condition
Fair
inspected September 2023
Type
Slab
Concrete Continuous
Length
220 ft
5 main spans
Daily traffic
2,265
2024 count
Owner
State
State Highway Agency

About this bridge

Rp IS670E to Centr over Fill is a concrete continuous slab carrying Rp IS670E to Centr over Fill in Jackson County, Missouri. It was built in 1966, so it is 59 years old, older than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,265 vehicles a day, roughly 19% of them trucks, projected to reach 3,058 by 2044. The structure is 220 ft (67.1 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesRp IS670E to Centr
CrossesFill
LocationS 5 T 49 N R 33 W
RouteState Highway 0
Coordinates39.09633, -94.58758
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating83.3 US tons
Inventory rating50.6 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans5
Design loadH 10
Structure length220 ft (67.1 m)
Longest span44 ft (13.4 m)
Deck width24 ft (7.2 m)
Roadway width18 ft (5.6 m)
Vertical clearance over deck15 ft (4.7 m)

Traffic and service

Average daily traffic2,265 (2024)
Projected traffic3,058 by 2044
Trucks19%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Rp IS670E to Centr over Fill built?

It was built in 1966, making it 59 years old in 2025.

What condition is Rp IS670E to Centr over Fill in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does Rp IS670E to Centr over Fill carry?

About 2,265 vehicles per day (2024 count), of which roughly 19% are trucks.

How long is Rp IS670E to Centr over Fill?

The structure is 220 ft (67.1 m) long with a longest span of 44 ft (13.4 m) and a deck 24 ft wide.

Who owns Rp IS670E to Centr over Fill?

It is owned by the State Highway Agency.