US Bridges

SW Murray RD over Drain Dtch

Good

Jackson County, Missouri · S 12 T 47 N R 32 W · Structure no. 35091

Built
2015
10 years old
Condition
Good
inspected January 2023
Type
Culvert
Concrete Continuous
Length
33 ft
2 main spans
Daily traffic
1,800
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

SW Murray RD over Drain Dtch is a concrete continuous culvert carrying SW Murray RD over Drain Dtch in Jackson County, Missouri. It was built in 2015, so it is 10 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,800 vehicles a day, roughly 5% of them trucks, projected to reach 2,340 by 2044. The structure is 33 ft (10.2 m) long. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSW Murray RD
CrossesDrain Dtch
LocationS 12 T 47 N R 32 W
RouteCity Street 0
Coordinates38.91064, -94.40392
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJanuary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating82.3 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadHS 20
Structure length33 ft (10.2 m)
Longest span16 ft (4.9 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,800 (2024)
Projected traffic2,340 by 2044
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SW Murray RD over Drain Dtch built?

It was built in 2015, making it 10 years old in 2025.

What condition is SW Murray RD over Drain Dtch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.

How much traffic does SW Murray RD over Drain Dtch carry?

About 1,800 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is SW Murray RD over Drain Dtch?

The structure is 33 ft (10.2 m) long with a longest span of 16 ft (4.9 m).

Who owns SW Murray RD over Drain Dtch?

It is owned by the City or Municipal Highway Agency.