US Bridges

30th ST over Trib of Rock CR

Good

Jackson County, Missouri · S 15 T 49 N R 32 W · Structure no. 34929

Built
2014
11 years old
Condition
Good
inspected February 2023
Type
Slab
Concrete Continuous
Length
23 ft
2 main spans
Daily traffic
100
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

30th ST over Trib of Rock CR is a concrete continuous slab carrying 30th ST over Trib of Rock CR in Jackson County, Missouri. It was built in 2014, so it is 11 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 10% of them trucks, projected to reach 130 by 2044. The structure is 23 ft (7 m) long and 35 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Carries30th ST
CrossesTrib of Rock CR
LocationS 15 T 49 N R 32 W
RouteCity Street 0
Coordinates39.06728, -94.42975
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.4 US tons
Inventory rating42.7 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, precast panels
Main spans2
Design loadHS 20
Structure length23 ft (7 m)
Longest span10 ft (3 m)
Deck width35 ft (10.8 m)
Roadway width33 ft (10.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2024)
Projected traffic130 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 30th ST over Trib of Rock CR built?

It was built in 2014, making it 11 years old in 2025.

What condition is 30th ST over Trib of Rock CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does 30th ST over Trib of Rock CR carry?

About 100 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is 30th ST over Trib of Rock CR?

The structure is 23 ft (7 m) long with a longest span of 10 ft (3 m) and a deck 35 ft wide.

Who owns 30th ST over Trib of Rock CR?

It is owned by the City or Municipal Highway Agency.