US Bridges

SB Paseo over Brush CR

Fair

Jackson County, Missouri · S 28 T 49 N R 33 W · Structure no. 28223

Built
1996
29 years old
Condition
Fair
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
189 ft
3 main spans
Daily traffic
4,784
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

SB Paseo over Brush CR is a prestressed concrete continuous stringer/multi-beam or girder carrying SB Paseo over Brush CR in Jackson County, Missouri. It was built in 1996, so it is 29 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,784 vehicles a day, roughly 5% of them trucks, projected to reach 6,219 by 2044. The structure is 189 ft (57.6 m) long and 41 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSB Paseo
CrossesBrush CR
LocationS 28 T 49 N R 33 W
RouteCity Street 0
Coordinates39.04041, -94.56845
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating98.2 US tons
Inventory rating69.4 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length189 ft (57.6 m)
Longest span121 ft (36.9 m)
Deck width41 ft (12.6 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,784 (2024)
Projected traffic6,219 by 2044
Trucks5%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SB Paseo over Brush CR built?

It was built in 1996, making it 29 years old in 2025.

What condition is SB Paseo over Brush CR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does SB Paseo over Brush CR carry?

About 4,784 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is SB Paseo over Brush CR?

The structure is 189 ft (57.6 m) long with a longest span of 121 ft (36.9 m) and a deck 41 ft wide.

Who owns SB Paseo over Brush CR?

It is owned by the City or Municipal Highway Agency.