Is 70 W over Cst Jackson Ave
FairJackson County, Missouri · S 14 T 49 N R 33 W · Structure no. 275
- Built
- 1960
- 65 years old, rebuilt 1986
- Condition
- Fair
- inspected August 2023
- Type
- Box Beam or Girders - Single or Spread
- Concrete Continuous
- Length
- 183 ft
- 3 main spans
- Daily traffic
- 45,701
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Is 70 W over Cst Jackson Ave is a concrete continuous box beam or girders - single or spread carrying Is 70 W over Cst Jackson Ave in Jackson County, Missouri. It was built in 1960 and reconstructed in 1986, so it is 65 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 45,701 vehicles a day, roughly 18% of them trucks, projected to reach 61,696 by 2044. The structure is 183 ft (55.8 m) long and 49 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Is 70 W over Cst Jackson Ave built?
It was built in 1960, making it 65 years old in 2025. It was reconstructed in 1986.
What condition is Is 70 W over Cst Jackson Ave in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Is 70 W over Cst Jackson Ave carry?
About 45,701 vehicles per day (2024 count), of which roughly 18% are trucks.
How long is Is 70 W over Cst Jackson Ave?
The structure is 183 ft (55.8 m) long with a longest span of 79 ft (24.1 m) and a deck 49 ft wide.
Who owns Is 70 W over Cst Jackson Ave?
It is owned by the State Highway Agency.