US Bridges

Rp Stadium DR to I over UP RR

FairPosted for load

Jackson County, Missouri · S 19 T 49 N R 32 W · Structure no. 2452

Built
1972
53 years old
Condition
Fair
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
172 ft
3 main spans
Daily traffic
2,829
2024 count
Owner
State
State Highway Agency

About this bridge

Rp Stadium DR to I over UP RR is a steel continuous stringer/multi-beam or girder carrying Rp Stadium DR to I over UP RR in Jackson County, Missouri. It was built in 1972, so it is 53 years old, older than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 2,829 vehicles a day, roughly 6% of them trucks, projected to reach 3,819 by 2044. The structure is 172 ft (52.4 m) long and 41 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesRp Stadium DR to I
CrossesUP RR
LocationS 19 T 49 N R 32 W
RouteState Highway 0
Coordinates39.05339, -94.49742
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.5 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length172 ft (52.4 m)
Longest span66 ft (20.1 m)
Deck width41 ft (12.4 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,829 (2024)
Projected traffic3,819 by 2044
Trucks6%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesRailroad
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Rp Stadium DR to I over UP RR built?

It was built in 1972, making it 53 years old in 2025.

What condition is Rp Stadium DR to I over UP RR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does Rp Stadium DR to I over UP RR carry?

About 2,829 vehicles per day (2024 count), of which roughly 6% are trucks.

How long is Rp Stadium DR to I over UP RR?

The structure is 172 ft (52.4 m) long with a longest span of 66 ft (20.1 m) and a deck 41 ft wide.

Who owns Rp Stadium DR to I over UP RR?

It is owned by the State Highway Agency.