Rp Charlotte ST to over Is 670
FairJackson County, Missouri · S 5 T 49 N R 33 W · Structure no. 218
- Built
- 1958
- 67 years old, rebuilt 2013
- Condition
- Fair
- inspected September 2023
- Type
- Box Beam or Girders - Single or Spread
- Concrete Continuous
- Length
- 159 ft
- 3 main spans
- Daily traffic
- 2,539
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Rp Charlotte ST to over Is 670 is a concrete continuous box beam or girders - single or spread carrying Rp Charlotte ST to over Is 670 in Jackson County, Missouri. It was built in 1958 and reconstructed in 2013, so it is 67 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,539 vehicles a day, roughly 18% of them trucks, projected to reach 3,428 by 2044. The structure is 159 ft (48.5 m) long and 25 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Rp Charlotte ST to over Is 670 built?
It was built in 1958, making it 67 years old in 2025. It was reconstructed in 2013.
What condition is Rp Charlotte ST to over Is 670 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does Rp Charlotte ST to over Is 670 carry?
About 2,539 vehicles per day (2024 count), of which roughly 18% are trucks.
How long is Rp Charlotte ST to over Is 670?
The structure is 159 ft (48.5 m) long with a longest span of 66 ft (20.1 m) and a deck 25 ft wide.
Who owns Rp Charlotte ST to over Is 670?
It is owned by the State Highway Agency.