US Bridges

US 59 S over Davis CR

Good

Holt County, Missouri · S 31 T 62 N R 38 W · Structure no. 35659

Built
2018
7 years old
Condition
Good
inspected November 2023
Type
Tee Beam
Prestressed Concrete
Length
102 ft
1 main span
Daily traffic
980
2024 count
Owner
State
State Highway Agency

About this bridge

US 59 S over Davis CR is a prestressed concrete tee beam carrying US 59 S over Davis CR in Holt County, Missouri. It was built in 2018, so it is 7 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 980 vehicles a day, roughly 8% of them trucks, projected to reach 1,274 by 2044. The structure is 102 ft (31 m) long and 31 ft wide. If it were closed, the detour would be 18 mi (29 km).

CarriesUS 59 S
CrossesDavis CR
LocationS 31 T 62 N R 38 W
RouteU.S. Route 59
Coordinates40.1317, -95.22261
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating77.4 US tons
Inventory rating40.7 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length102 ft (31 m)
Longest span98 ft (29.9 m)
Deck width31 ft (9.3 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic980 (2024)
Projected traffic1,274 by 2044
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed18 mi (29 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 59 S over Davis CR built?

It was built in 2018, making it 7 years old in 2025.

What condition is US 59 S over Davis CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does US 59 S over Davis CR carry?

About 980 vehicles per day (2024 count), of which roughly 8% are trucks.

How long is US 59 S over Davis CR?

The structure is 102 ft (31 m) long with a longest span of 98 ft (29.9 m) and a deck 31 ft wide.

Who owns US 59 S over Davis CR?

It is owned by the State Highway Agency.