US Bridges

E 225th ST over Indian CR

Good

Harrison County, Missouri · S 36 T 65 N R 28 W · Structure no. 35028

Built
2014
11 years old
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
50 ft
1 main span
Daily traffic
35
2024 count
Owner
County
County Highway Agency

About this bridge

E 225th ST over Indian CR is a steel stringer/multi-beam or girder carrying E 225th ST over Indian CR in Harrison County, Missouri. It was built in 2014, so it is 11 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 35 vehicles a day, roughly 10% of them trucks, projected to reach 40 by 2044. The structure is 50 ft (15.2 m) long and 25 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesE 225th ST
CrossesIndian CR
LocationS 36 T 65 N R 28 W
RouteCounty Highway 236
Coordinates40.38889, -93.98933
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66.5 US tons
Inventory rating39.7 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length50 ft (15.2 m)
Longest span49 ft (14.8 m)
Deck width25 ft (7.5 m)
Roadway width25 ft (7.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic35 (2024)
Projected traffic40 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was E 225th ST over Indian CR built?

It was built in 2014, making it 11 years old in 2025.

What condition is E 225th ST over Indian CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does E 225th ST over Indian CR carry?

About 35 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is E 225th ST over Indian CR?

The structure is 50 ft (15.2 m) long with a longest span of 49 ft (14.8 m) and a deck 25 ft wide.

Who owns E 225th ST over Indian CR?

It is owned by the County Highway Agency.