US Bridges

W 205 Ave over Trib W Fk Big Crq

Good

Harrison County, Missouri · S 3 T 65 N R 28 W · Structure no. 33128

Built
2010
15 years old
Condition
Good
inspected March 2024
Type
Slab
Concrete
Length
32 ft
1 main span
Daily traffic
15
2024 count
Owner
County
County Highway Agency

About this bridge

W 205 Ave over Trib W Fk Big Crq is a concrete slab carrying W 205 Ave over Trib W Fk Big Crq in Harrison County, Missouri. It was built in 2010, so it is 15 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 15 vehicles a day, roughly 10% of them trucks, projected to reach 17 by 2044. The structure is 32 ft (9.8 m) long and 20 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesW 205 Ave
CrossesTrib W Fk Big Crq
LocationS 3 T 65 N R 28 W
RouteCounty Highway 162
Coordinates40.45805, -94.03505
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating71.4 US tons
Inventory rating42.7 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length32 ft (9.8 m)
Longest span31 ft (9.3 m)
Deck width20 ft (6.1 m)
Roadway width19 ft (5.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15 (2024)
Projected traffic17 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was W 205 Ave over Trib W Fk Big Crq built?

It was built in 2010, making it 15 years old in 2025.

What condition is W 205 Ave over Trib W Fk Big Crq in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does W 205 Ave over Trib W Fk Big Crq carry?

About 15 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is W 205 Ave over Trib W Fk Big Crq?

The structure is 32 ft (9.8 m) long with a longest span of 31 ft (9.3 m) and a deck 20 ft wide.

Who owns W 205 Ave over Trib W Fk Big Crq?

It is owned by the County Highway Agency.