US Bridges

Farm Road 124 over Clear Crk

Good

Greene County, Missouri · S 11 T 29 N R 23 W · Structure no. 37396

Built
2024
1 years old
Condition
Good
inspected October 2024
Type
Culvert
Concrete
Length
20 ft
2 main spans
Daily traffic
614
2024 count
Owner
County
County Highway Agency

About this bridge

Farm Road 124 over Clear Crk is a concrete culvert carrying Farm Road 124 over Clear Crk in Greene County, Missouri. It was built in 2024, so it is 1 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 614 vehicles a day, roughly 10% of them trucks, projected to reach 1,259 by 2044. The structure is 20 ft (6.2 m) long and 43 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesFarm Road 124
CrossesClear Crk
LocationS 11 T 29 N R 23 W
RouteCounty Highway 124
Coordinates37.22774, -93.42187
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert9 ExcellentNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66.5 US tons
Inventory rating39.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length20 ft (6.2 m)
Longest span10 ft (3 m)
Deck width43 ft (13 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic614 (2024)
Projected traffic1,259 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Farm Road 124 over Clear Crk built?

It was built in 2024, making it 1 years old in 2025.

What condition is Farm Road 124 over Clear Crk in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Farm Road 124 over Clear Crk carry?

About 614 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Farm Road 124 over Clear Crk?

The structure is 20 ft (6.2 m) long with a longest span of 10 ft (3 m) and a deck 43 ft wide.

Who owns Farm Road 124 over Clear Crk?

It is owned by the County Highway Agency.