US Bridges

US 60 E over Mo 125

Good

Greene County, Missouri · S 21 T 28 N R 20 W · Structure no. 36900

Built
2024
1 years old
Condition
Good
inspected August 2024
Type
Tee Beam
Prestressed Concrete Continuous
Length
183 ft
2 main spans
Daily traffic
26,727
2024 count
Owner
State
State Highway Agency

About this bridge

US 60 E over Mo 125 is a prestressed concrete continuous tee beam carrying US 60 E over Mo 125 in Greene County, Missouri. It was built in 2024, so it is 1 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 26,727 vehicles a day, roughly 14% of them trucks, projected to reach 41,427 by 2044. The structure is 183 ft (55.9 m) long and 81 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 60 E
CrossesMo 125
LocationS 21 T 28 N R 20 W
RouteU.S. Route 60
Coordinates37.11881, -93.11934
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating91.3 US tons
Inventory rating47.6 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length183 ft (55.9 m)
Longest span90 ft (27.4 m)
Deck width81 ft (24.6 m)
Roadway width76 ft (23.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic26,727 (2024)
Projected traffic41,427 by 2044
Trucks14%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 60 E over Mo 125 built?

It was built in 2024, making it 1 years old in 2025.

What condition is US 60 E over Mo 125 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does US 60 E over Mo 125 carry?

About 26,727 vehicles per day (2024 count), of which roughly 14% are trucks.

How long is US 60 E over Mo 125?

The structure is 183 ft (55.9 m) long with a longest span of 90 ft (27.4 m) and a deck 81 ft wide.

Who owns US 60 E over Mo 125?

It is owned by the State Highway Agency.