US Bridges

Mo 125 S over James Rvr

Good

Greene County, Missouri · S 28 T 29 N R 20 W · Structure no. 33029

Built
2010
15 years old
Condition
Good
inspected August 2024
Type
Tee Beam
Prestressed Concrete Continuous
Length
393 ft
4 main spans
Daily traffic
2,571
2024 count
Owner
State
State Highway Agency

About this bridge

Mo 125 S over James Rvr is a prestressed concrete continuous tee beam carrying Mo 125 S over James Rvr in Greene County, Missouri. It was built in 2010, so it is 15 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,571 vehicles a day, roughly 24% of them trucks, projected to reach 4,114 by 2044. The structure is 393 ft (119.8 m) long and 31 ft wide. If it were closed, the detour would be 16.2 mi (26 km).

CarriesMo 125 S
CrossesJames Rvr
LocationS 28 T 29 N R 20 W
RouteState Highway 125
Coordinates37.19227, -93.12831
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating64.5 US tons
Inventory rating35.7 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length393 ft (119.8 m)
Longest span100 ft (30.5 m)
Deck width31 ft (9.3 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,571 (2024)
Projected traffic4,114 by 2044
Trucks24%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed16.2 mi (26 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Mo 125 S over James Rvr built?

It was built in 2010, making it 15 years old in 2025.

What condition is Mo 125 S over James Rvr in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Mo 125 S over James Rvr carry?

About 2,571 vehicles per day (2024 count), of which roughly 24% are trucks.

How long is Mo 125 S over James Rvr?

The structure is 393 ft (119.8 m) long with a longest span of 100 ft (30.5 m) and a deck 31 ft wide.

Who owns Mo 125 S over James Rvr?

It is owned by the State Highway Agency.