US Bridges

Farm RD 94 over Clear CR

Good

Greene County, Missouri · S 4 T 29 N R 23 W · Structure no. 31121

Built
2003
22 years old
Condition
Good
inspected May 2024
Type
Culvert
Concrete Continuous
Length
49 ft
3 main spans
Daily traffic
320
2024 count
Owner
County
County Highway Agency

About this bridge

Farm RD 94 over Clear CR is a concrete continuous culvert carrying Farm RD 94 over Clear CR in Greene County, Missouri. It was built in 2003, so it is 22 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 320 vehicles a day, roughly 5% of them trucks, projected to reach 656 by 2044. The structure is 49 ft (14.9 m) long and 26 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesFarm RD 94
CrossesClear CR
LocationS 4 T 29 N R 23 W
RouteCounty Highway 94
Coordinates37.27551, -93.44878
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66.5 US tons
Inventory rating39.7 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length49 ft (14.9 m)
Longest span16 ft (4.9 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic320 (2024)
Projected traffic656 by 2044
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Farm RD 94 over Clear CR built?

It was built in 2003, making it 22 years old in 2025.

What condition is Farm RD 94 over Clear CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Farm RD 94 over Clear CR carry?

About 320 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is Farm RD 94 over Clear CR?

The structure is 49 ft (14.9 m) long with a longest span of 16 ft (4.9 m) and a deck 26 ft wide.

Who owns Farm RD 94 over Clear CR?

It is owned by the County Highway Agency.