Mo 100 E over Gasconade Rvr
FairGasconade County, Missouri · S 12 T 45 N R 6 W · Structure no. 3870
- Built
- 1995
- 30 years old
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 953 ft
- 3 main spans
- Daily traffic
- 874
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Mo 100 E over Gasconade Rvr is a steel continuous stringer/multi-beam or girder carrying Mo 100 E over Gasconade Rvr in Gasconade County, Missouri. It was built in 1995, so it is 30 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 874 vehicles a day, roughly 10% of them trucks, projected to reach 1,136 by 2044. The structure is 953 ft (290.5 m) long and 35 ft wide. If it were closed, the detour would be 24.2 mi (39 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mo 100 E over Gasconade Rvr built?
It was built in 1995, making it 30 years old in 2025.
What condition is Mo 100 E over Gasconade Rvr in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does Mo 100 E over Gasconade Rvr carry?
About 874 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Mo 100 E over Gasconade Rvr?
The structure is 953 ft (290.5 m) long with a longest span of 150 ft (45.7 m) and a deck 35 ft wide.
Who owns Mo 100 E over Gasconade Rvr?
It is owned by the State Highway Agency.