Lit Indian CR RD over Girard Br of India
GoodFranklin County, Missouri · S 32 T 41 N R 1 E · Structure no. 36981
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 44 ft
- 1 main span
- Daily traffic
- 175
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Lit Indian CR RD over Girard Br of India is a steel stringer/multi-beam or girder carrying Lit Indian CR RD over Girard Br of India in Franklin County, Missouri. It was built in 2023, so it is 2 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 175 vehicles a day, roughly 33% of them trucks, projected to reach 315 by 2043. The structure is 44 ft (13.4 m) long and 31 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lit Indian CR RD over Girard Br of India built?
It was built in 2023, making it 2 years old in 2025.
What condition is Lit Indian CR RD over Girard Br of India in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does Lit Indian CR RD over Girard Br of India carry?
About 175 vehicles per day (2023 count), of which roughly 33% are trucks.
How long is Lit Indian CR RD over Girard Br of India?
The structure is 44 ft (13.4 m) long with a longest span of 42 ft (12.8 m) and a deck 31 ft wide.
Who owns Lit Indian CR RD over Girard Br of India?
It is owned by the County Highway Agency.