US Bridges

Moselle RD over Ck to Meramec Rvr

Good

Franklin County, Missouri · S 16 T 42 N R 1 E · Structure no. 32325

Built
2008
17 years old
Condition
Good
inspected January 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
44 ft
1 main span
Daily traffic
100
2023 count
Owner
County
County Highway Agency

About this bridge

Moselle RD over Ck to Meramec Rvr is a prestressed concrete stringer/multi-beam or girder carrying Moselle RD over Ck to Meramec Rvr in Franklin County, Missouri. It was built in 2008, so it is 17 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 8% of them trucks, projected to reach 180 by 2043. The structure is 44 ft (13.4 m) long and 27 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMoselle RD
CrossesCk to Meramec Rvr
LocationS 16 T 42 N R 1 E
RouteCounty Highway 258
Coordinates38.37601, -90.90977
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating71.4 US tons
Inventory rating42.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length44 ft (13.4 m)
Longest span41 ft (12.5 m)
Deck width27 ft (8.1 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2023)
Projected traffic180 by 2043
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Moselle RD over Ck to Meramec Rvr built?

It was built in 2008, making it 17 years old in 2025.

What condition is Moselle RD over Ck to Meramec Rvr in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does Moselle RD over Ck to Meramec Rvr carry?

About 100 vehicles per day (2023 count), of which roughly 8% are trucks.

How long is Moselle RD over Ck to Meramec Rvr?

The structure is 44 ft (13.4 m) long with a longest span of 41 ft (12.5 m) and a deck 27 ft wide.

Who owns Moselle RD over Ck to Meramec Rvr?

It is owned by the County Highway Agency.