Pin Oak RD over Boeuf CR (big Br)
FairPosted for loadFranklin County, Missouri · S 10 T 43 N R 4 W · Structure no. 18202
- Built
- 1950
- 75 years old
- Condition
- Fair
- inspected March 2025
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 32 ft
- 1 main span
- Daily traffic
- 100
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Pin Oak RD over Boeuf CR (big Br) is a steel stringer/multi-beam or girder carrying Pin Oak RD over Boeuf CR (big Br) in Franklin County, Missouri. It was built in 1950, so it is 75 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 100 vehicles a day, roughly 12% of them trucks, projected to reach 180 by 2043. The structure is 32 ft (9.8 m) long and 22 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pin Oak RD over Boeuf CR (big Br) built?
It was built in 1950, making it 75 years old in 2025.
What condition is Pin Oak RD over Boeuf CR (big Br) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2025.
How much traffic does Pin Oak RD over Boeuf CR (big Br) carry?
About 100 vehicles per day (2023 count), of which roughly 12% are trucks.
How long is Pin Oak RD over Boeuf CR (big Br)?
The structure is 32 ft (9.8 m) long with a longest span of 30 ft (9.1 m) and a deck 22 ft wide.
Who owns Pin Oak RD over Boeuf CR (big Br)?
It is owned by the County Highway Agency.