W Martin ST over Drain Dtch
FairDunklin County, Missouri · S 3 T 21 N R 9 E · Structure no. 14453
- Built
- 1920
- 105 years old
- Condition
- Fair
- inspected February 2024
- Type
- Slab
- Concrete
- Length
- 22 ft
- 1 main span
- Daily traffic
- 200
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
W Martin ST over Drain Dtch is a concrete slab carrying W Martin ST over Drain Dtch in Dunklin County, Missouri. It was built in 1920, so it is 105 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 200 vehicles a day, roughly 10% of them trucks, projected to reach 280 by 2044. The structure is 22 ft (6.7 m) long and 20 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was W Martin ST over Drain Dtch built?
It was built in 1920, making it 105 years old in 2025.
What condition is W Martin ST over Drain Dtch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does W Martin ST over Drain Dtch carry?
About 200 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is W Martin ST over Drain Dtch?
The structure is 22 ft (6.7 m) long with a longest span of 20 ft (6.1 m) and a deck 20 ft wide.
Who owns W Martin ST over Drain Dtch?
It is owned by the County Highway Agency and maintained by the City or Municipal Highway Agency.