US Bridges

SW Grindstone RD over Castile CR

Fair

DeKalb County, Missouri · S 13 T 58 N R 32 W · Structure no. 32123

Built
2007
18 years old
Condition
Fair
inspected February 2025
Type
Stringer/Multi-beam or Girder
Steel
Length
63 ft
1 main span
Daily traffic
10
2024 count
Owner
County
County Highway Agency

About this bridge

SW Grindstone RD over Castile CR is a steel stringer/multi-beam or girder carrying SW Grindstone RD over Castile CR in DeKalb County, Missouri. It was built in 2007, so it is 18 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 10 vehicles a day, roughly 10% of them trucks, projected to reach 12 by 2044. The structure is 63 ft (19.1 m) long and 21 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesSW Grindstone RD
CrossesCastile CR
LocationS 13 T 58 N R 32 W
RouteCounty Highway 267
Coordinates39.83528, -94.44991
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67.5 US tons
Inventory rating40.7 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length63 ft (19.1 m)
Longest span62 ft (18.8 m)
Deck width21 ft (6.3 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10 (2024)
Projected traffic12 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SW Grindstone RD over Castile CR built?

It was built in 2007, making it 18 years old in 2025.

What condition is SW Grindstone RD over Castile CR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.

How much traffic does SW Grindstone RD over Castile CR carry?

About 10 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is SW Grindstone RD over Castile CR?

The structure is 63 ft (19.1 m) long with a longest span of 62 ft (18.8 m) and a deck 21 ft wide.

Who owns SW Grindstone RD over Castile CR?

It is owned by the County Highway Agency.