NW Sharp RD over Lit 3rd Fk Platte
FairDeKalb County, Missouri · S 16 T 60 N R 32 W · Structure no. 29280
- Built
- 2001
- 24 years old
- Condition
- Fair
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 28 ft
- 2 main spans
- Daily traffic
- 20
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
NW Sharp RD over Lit 3rd Fk Platte is a steel continuous stringer/multi-beam or girder carrying NW Sharp RD over Lit 3rd Fk Platte in DeKalb County, Missouri. It was built in 2001, so it is 24 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 20 vehicles a day, roughly 10% of them trucks, projected to reach 23 by 2044. The structure is 28 ft (8.5 m) long and 18 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NW Sharp RD over Lit 3rd Fk Platte built?
It was built in 2001, making it 24 years old in 2025.
What condition is NW Sharp RD over Lit 3rd Fk Platte in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does NW Sharp RD over Lit 3rd Fk Platte carry?
About 20 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is NW Sharp RD over Lit 3rd Fk Platte?
The structure is 28 ft (8.5 m) long with a longest span of 14 ft (4.3 m) and a deck 18 ft wide.
Who owns NW Sharp RD over Lit 3rd Fk Platte?
It is owned by the County Highway Agency.